As Geoff observed, it was reproved in 89' under the 1954-1989 Rules. 3 Tons is for a max. service pressure of about 9000 psi
Original bores were 13/1 = .719" to .728". At reproof R .728" and L .732" so likely not much honing.
Are the chambers still 2 1/2"?