Joe , Jim has basically said what I would do in the circumstances .I have seen this used as a production method all be it the striker was riveted in place no doubt before heat treatment .
Welding is OK if you have the right material and fine for just increasing the nose length to compensate for wear ,if you are a good enough welder although with the advent of lazer welding this is now a "no problem job"